Bayline Viaduct Overpass
Back to PortfolioCivil Engineering

Bayline Viaduct Overpass

Project Parameters

Client OrganizationState Transit Authority
Engineering Scope2.4km Post-Tensioned Bridge Link
Project Duration18 Months

Services Administered

  • Civil Engineering
  • Site Supervision
  • Concrete Integrity Audits
  • Zoning & Environmental Review

The Engineering Challenge

Saturated soil and active seismic lines around the bay area demanded bridge piers capable of resisting extreme ground liquefaction and bending stresses.

Technical Solutions & Calculations

We executed geotechnical load simulations to optimize micro-piling depth parameters. Post-tensioned concrete box girders were engineered to absorb flexural shifts, with regular site-supervision validating concrete slumps on site.

Structural & Financial Results

Successfully commissioned ahead of schedule with 100% safety sign-offs, passing structural stress stress tests on all bridge bearings.