Project Parameters
Client OrganizationState Transit Authority
Engineering Scope2.4km Post-Tensioned Bridge Link
Project Duration18 Months
Services Administered
- Civil Engineering
- Site Supervision
- Concrete Integrity Audits
- Zoning & Environmental Review
The Engineering Challenge
Saturated soil and active seismic lines around the bay area demanded bridge piers capable of resisting extreme ground liquefaction and bending stresses.
Technical Solutions & Calculations
We executed geotechnical load simulations to optimize micro-piling depth parameters. Post-tensioned concrete box girders were engineered to absorb flexural shifts, with regular site-supervision validating concrete slumps on site.
Structural & Financial Results
Successfully commissioned ahead of schedule with 100% safety sign-offs, passing structural stress stress tests on all bridge bearings.